Stages of Home Building | |||
www.c21rgsp.com |
Lender approval and release of contingencies for startApply for building permit Stake the building Dig footers Temporary power hook-up in place Footer inspection/city Pour footers Engineers pin building footing Masons lay foundation blocksFoundation inspection/city Prep crawl area Install perimeter drains Frame first floor system walls Install water and sewer laterals Frame deck package Frame second floor system walls Truss deliveryCrane to set trusses Frame roof system Install exterior doors Prep garage slab Install windows Frame exterior trim install HVAC rough-in Pour garage slabBuild & install fireplace Paint exterior (if any) Install plumbing rough-in Install electrical rough-in Install roof finish Plumbing/flect/HVAC inspection Install vinyl siding Masons install face brickInstall batt insulation Hang and finish drywall Flat work prep Install guttering Pour and finish exterior concrete Rough grade/yard Install attic insulation/blown Install garage door and seed Install landscaping package Final grading and see Install mailbox Install splash blocks Prime walls for painting Switch/plug installation Install vinyl and ceramic flooring Install cabinets and topsInstall interior trim Paint interior of building Appliance delivery/install Trim-out/plumbing Trim-out/electrical Trim-out HVAC Install mirrors Install bath accessoriesInstall shelving Install carpets Install door/cabinet knobs Cleaning done Final inspection Company punch list Homeowner visit/list Closing |
|||